Steel Rails

Steel rails are the main components of railway tracks. Its function is to guide the wheels of the rolling stock to move forward, bear the huge pressure of the wheels, and transmit them to the sleepers. The rails must provide the wheels with a continuous, smooth and least drag rolling surface. Each country in the world has its own standards for producing rails, and the classification methods are also different. British standard: BS series, German standard: DIN series, American standard: ASCE series, Japanese standard: JIS series.


  Contact Now
Product Details

PRODUCT  PARAMETERS

Steel rails are the main components of railway tracks. Its function is to guide the wheels of the rolling stock to move forward, bear the huge pressure of the wheels, and transmit them to the sleepers. The rails must provide the wheels with a continuous, smooth and least drag rolling surface. Each country in the world has its own standards for producing rails, and the classification methods are also different. British standard: BS series, German standard: DIN series, American standard: ASCE series, Japanese standard: JIS series.

Steel Rails

Name

Rail 

Grade

Q235B  55Q  U71Mn  50Mu  900A  R260

Standard

GB  JIS  ASCE  BS  GOST  DIN

Size

6kg-50kg  BS60A-BS90A  ASCE25-ASCE85 S14-S30  A45-A65  50N

Technique

Hot Rolled

Length

1m-12m  

Application

Abrasive tools  Machine tool  Bridge  Mine  Ship  Electricity

Lead time

5 to 25 working days after the receipt of 30% deposit

Payment terms

30%TT for deposit, 70% balance before shipment or LC at sight

Packing

Wooden pallet or according to customer's request


PRODUCT PACKAGING

Packing Details: Bundle with steel strip, shipped in wooden cases or wooden pallets

Delivery Details: Use trays to facilitate loading and unloading

Standard Export Seaworthy Package.

Or Package can also be according to your requirements.

Steel Rails


APPLICATION FIELD

The main supply fields are: aerospace, national defense equipment, military weapons, chemical industry, shipbuilding, nuclear energy, trains, containers, environmental protection, precision machining, auto parts, machinery, electronic products, molds, medical treatment Equipment, construction, decoration, etc.

Steel Rails


FAQ
Q: How lengthy is your transport time?
A: Generally it is 3-5 days if the items are in stock. Or it is 15-20 days if the items are no longer in stock, it is in accordance to quantity.
Q: Do you supply samples ? is it free or extra?
A:Yes, we should provide the pattern for free cost however do no longer pay the value of freight.
Q: What is your MOQ?
A: Usually our MOQ is 1t. But if your volume is small, the charge may additionally be a little higher. When there is a large quantity, the charge will be pretty lower.
Q:How to pay?
A: TT and L/C are applicable and TT will be greater appreciated.30% savings earlier than producing, 70% stability earlier than loading through TT.
Q:How to deploy after the items destination?
A: We will furnish set up training and video for you. Technicians will be despatched to assist you if it is necessary. However, the visa fee, air tickets, accommodation, wages will be furnished by using buyers.
Q:How to get an correct quotation?
A:Product element measurement & Length,product quantities,product fabric grade.


Leave your messages
x

Submitted successfully

We will contact you as soon as possible

Close